not including the main materials

Tematy nie związane z serialem, czyli można rozmawiać (prawie) o wszystkim :)

not including the main materials

Postprzez Qizhenbi » Cz maja 17, 2018 7:57 am

Although the company's prices are also one of the best. Ms. Zhang held the idea of ​​guaranteeing the quality of large companies, one-for-one price and one-for-one goods. He signed a half-pack with the big company (ie, the decoration company was responsible for packing sand,
pipelines, and other auxiliary materials outside of manpower, not including the main materials. ) Decoration contract. According to the designer’s budget, Ms. Zhang’s 130-square-metre, three-bedroom, half-packet labor and auxiliary materials cost more than 60,000 yuan,
and the decoration company’s management fee will be increased by 10%. Have to pay another 4,000 yuan design fee. After all, Ms. Zhang paid a total of more than 70,000 yuan to the decoration company, which is 80% higher than the 40,000 hectares of half-price packages opened by a small contractor.
Related links:
wood plastic gear pump



nature of plastic composite
Qizhenbi
 
Posty: 5392
Dołączył(a): Śr mar 15, 2017 4:37 am

Powrót do Off-topic

Kto przegląda forum

Użytkownicy przeglądający ten dział: apple2000 i 12 gości